HD Hyundai Heavy Industries lands a fourth US Navy maintenance contract, with work in Ulsan from January
The South Korean shipbuilder will overhaul the 7th Fleet dry cargo and ammunition ship USNS Wally Schirra in Ulsan from January 2027 and return it in March.
TAIPEI —
South Korea's HD Hyundai Heavy Industries has won its fourth maintenance contract for a US Navy ship, adding the dry cargo and ammunition ship USNS Wally Schirra to a growing list of American naval vessels repaired at its yards.
The company said on 20 November that it had secured a mid-term maintenance job for the roughly 40,000-ton ship, which is assigned to the US Navy's 7th Fleet. The Lewis and Clark-class vessel entered service in 2009 and is 210 metres long, 32.2 metres wide and has a draught of 9.1 metres.
Work to start in January
Work is due to begin in January 2027 at a quay near the shipbuilder's mid-sized ship division in Ulsan. The yard will handle more than 80 maintenance items covering the hull, structure, propulsion, electrical and auxiliary systems, and plans to return the ship to the US Navy in March.
The Wally Schirra carries ammunition, food and spare parts to combat ships, KED Global has reported, making it part of the logistics chain that keeps US warships deployed.
A record built since 2025
HD Hyundai Heavy Industries won its first US Navy maintenance job in August 2025. It has since completed and delivered three ships under separate contracts: USNS Alan Shepard, USNS Cesar Chavez and USNS Richard E. Byrd.
After the Richard E. Byrd job, the company received the top rating of Exceptional in six of the seven categories of the US Navy's Contractor Performance Assessment Reporting System, which grades contractors on areas such as work quality, schedule and technical capability, UPI reported.
Joo Won-ho, president of HD Hyundai Heavy Industries and head of its naval and special ship business, said the award recognised the yard's maintenance technology and its record of executing projects. He said the company would deepen cooperation with the US Navy and keep looking for more work in the global naval maintenance market.
Second stint in a Korean yard
The ship is no stranger to South Korean dry docks. It entered Hanwha Ocean's shipyard in Geoje in September 2024 for a six-month overhaul, the first of a US Navy ship in South Korea, KED Global reported at the time. Engineers found about 260 corroded sections, and the ship sailed again on 13 March 2025.
That report said US shipyards had struggled with maintenance delays, pushing the Pentagon to look to allied yards in South Korea and Japan to share the work.
On the day of the new award, a delegation led by Mark D. Johnson, deputy administrator of the US Maritime Administration, visited the Ulsan shipyard, Businesskorea reported. Company executives discussed taking part in the agency's logistics support vessel acquisition programme and working together on port infrastructure, and the visitors toured a car carrier under construction.
Sources
More in Industry
Indian drone industry says 689 military tenders named Chinese parts, most of them from the Army
Drone Federation India has urged the defence secretary and India's defence chief to bar Chinese drone parts after finding 580 Army tenders that named them.
TaiwanDefence · 3h ago · 2 min read
Leonardo DRS to develop a new heat-seeking sensor for THAAD missile-defence interceptors
BAE Systems has hired the US firm to design a next-generation infrared array for the THAAD seeker as output of the seekers is set to rise about fourfold.
TaiwanDefence · 21h ago · 2 min read
Adani Defence shows Indian Army an 8 km vehicle-mounted anti-tank missile system at Pokhran
Adani's Bagheera AT1 fired four laser-guided missiles in day and night trials, including a two-round salvo built to beat a tank's active protection.
TaiwanDefence · 1d ago · 2 min read
Discussion (0)
Comments are not currently available.